The rainy season in the Bay Area has slowed down construction of the house and the studios temporarily. However, the first phase of the cabinetry was installed in the upstairs print studio last week.
Update on the Print Studio & Bindery

The rainy season in the Bay Area has slowed down construction of the house and the studios temporarily. However, the first phase of the cabinetry was installed in the upstairs print studio last week.
Last week, the majority of the press equipment and type was moved from storage into the studio.
Insulation is going into the studio this week.
This is a video of the book studio progress from the first of December 2019. There is a full basement underneath with stairs in the back and a wide open space for lifting heavy equipment down into the basement.